Upper Ohio Valley Bridge System Study
Phase II Final Report

(Click the links below to view the document.  Adobe®Acrobat® required.)

 

Cover - Table of Contents

Executive Summary - Introduction

Description of Study Area (Existing Bridges)

Description of Study Area (Economic Conditions Pt. 1)

Description of Study Area (Economic Conditions Pt. 2)

Description of Study Area (Condition Analysis)

Goals and Objectives

Public Involvement Process

Planning Process

Final Recommendations and Project Priortity

Appendix A

 

Full Document (5.4 MB)

 

 

Back to Upper Ohio Valley Regional Bridge System Needs and Location Study

©Edwards and Kelcey Site Maintained by M. Kirby Last Updated: July 7, 2003