Adopted*
Upper Ohio Valley Bridge Study Advisory Committee
Goals
and Objectives
Goals
- Maintain and Enhance
Transportation Capacity, Safety and Reliability for Existing Businesses,
their Employees and All Residents
- Provide Enhanced
Access for Expansion and Retention of Businesses, and Attraction of
New Businesses to the Region.
- Draw More Traffic
and Commerce into the Upper Ohio Valley.
- Develop Linkages
to High Capacity Intermodal Transportation by Strengthening the Connections
to River Ports and Railroads.
- Enhance Emergency
Management Options to Provide Alternative Routes in Case of Flood, Natural
Disaster or Accident.
- Improve Travel
Times Throughout the Region.
- Ensure that the
Cross-river Transport Network from Wheeling north to Steubenville is
Sufficiently Robust to Carry All Weights and Sizes of Commercial Vehicles.
* By
Action of the Advisory Committee, January 19, 2000
Objectives
Goal: Maintain
and Enhance Transportation for Existing Businesses.
- Provide Alternative
and Redundant Routes for Truck Traffic
- Alleviate Congestion
and Maintain an Acceptable Minimum Level of Service (LOS) to
- Enhance Shipment
of Goods and Movement of Employees
- Accurately Measure
Constraints of Roadways and Strive to Upgrade River Crossings and Connecting
Roadways to at least Current Minimum Standards for Geometry
Goal: Provide Access
for Expanding Business (Industry/Retail).
- Evaluate Transportation
Improvements and Alternatives for Their Ability to Serve Existing and
Potential Future Development Sites
- Evaluate Transportation
Improvements that Can Better Tie Together the BHJ Region With Adjacent
Economic Market Areas
- Prioritize Improvements
in Transportation Facilities and Cross-River Travel That Can Serve Targeted
Economic Development Objectives for the BHJ Region
Goal: Draw More
Traffic and Commerce into the Upper Ohio Valley.
- Develop Transportation
System Improvements that Will Provide Greater Interconnection With Surrounding
Regions, States, Municipalities and Marketplaces
- Build an Efficient
and Effective Transportation Network that Will Become a Regional Strength
and Draw Additional Traffic and Customers into the Steubenville - Weirton
Marketplace
Goal: Develop Linkages
to High Capacity Intermodal Transportation by Strengthening the Connections
to River Ports and Railroads.
- Consider Access
to Rail and River Port Facilities as a Locational Criteria for Transportation
Improvements and Cross-River Travel Routes
Goal: Enhance Emergency
Management Options to Provide Alternative Routes in Case of Flood, Natural
Disaster or Accident.
- Redundancy of the
Transportation Network and Cross-River Linkages During Times of Accident,
Flooding or Other Natural Disaster Should be a Planning Criteria for
New Major Investments in Infrastructure
- Roadway Design
Standards for New Travel Facilities Should Account for the Weight and
Size of Vehicles Expected to Travel During Times of Emergency, and at
all Other Times
Goal: Improve Travel
Times Throughout the Region.
- Establish Minimum
Desirable Levels of Service and Adequate Standards for Roadway and Bridge
Design
- Establish Time
of Travel as a Critical Planning Criteria for Prioritizing Capital Improvements
Goal: Ensure that
the Cross-river Transport Network from Wheeling north to Steubenville
is Sufficiently Robust to Carry All Weights and Sizes of Commercial Vehicles.
- Establish Planning
Criteria for the Larger Tri-State Region in Concert with the States
of Ohio, West Virginia and Pennsylvania to Ensure that Improvements
in the Steubenville-Weirton Area Help Enhance and Optimize the Larger
Transportation Network for All Modes
|